RV 89 Prop Temporary Support

Hydraulic Temporary Re-Usable Support

  • Installed as a temporary support in all areas before work commence
  • Tunnels, portals, stoping, development ends, ore passes, roadways and conveyor beltways
  • Suitable to stoping heights of 1.4m
  • Available from 0.9m to 4.1m
  • Hydraulic yield up to 7 ton
  • Re-usable multiple times
  • Remote installation from a safe distance
  • Prop released from a safe distance using a release tool
  • Lightweight and easy to use
  • Cannot be overextended
  • Active support on installation
  • No accidental release once installed
  • All RV 89 temporary props installed to the same load on the face
  • Excellent yielding throughout the range - 500mm to 1100mm yield
  • No nipping areas which could cause injury
  • Diameters of 89mm
  • Controlled yielding of the prop using valve technology
  • Provides active roof support with controlled yielding
  • Superb energy absorption
  • Uses a standard pump to energise
  • Can be supplied with hooks for safety nets
  • Complete with top and bottom plate
  • 240mm diameter domed plate
  • Carry handles attached for ease of transport
  • Various load spreader head boards available (tri head board shown)
  • Cost saving to the mine as prop can be repaired 
  • On-site training on RV89 prop by our experience staff